I'm currently building a simulation with Simulink. At this time, it is difficult to handle the initial value given first and the value obtained from the calculation. Specifically, a simulation is created based on the attitude control of a satellite. In brief, the control torque is calculated from the angular velocity, and the control torque is output by the actuator. This will update the satellite's angular velocity and attitude. I want to give this updated value again as the angular velocity of the next loop, but I don't know in what block to do it. I would be grateful if anyone could tell me if I could understand. I want the flow chart to look like the figure below. In the first loop, we use "Initial angular velocity" to calculate, but in the next loop we want to use "Update angular velocity" to calculate.I'm glad if you give me any opinions.
MATLAB: Use of initial value and calculated value.
MATLABsimulationsimulink
Best Answer