i hava data(voltage ) from which i want plot 1000 samples each generating at 1 mili second ,
if i use hist (data), i need those 1000 samples on x-axis , and the corresponding voltage values at y-axis or
using stem(data) does the same work what i need ?
plz clarify my doubt .
thanku
Manjunath
Best Answer