Dear all,
I have this date issue
dates= {
'11/2008' '12/2008' '1/02/2010' '2/02/2010' '12/03/2010' }
where 11/2008 is mm/yyyy As you can see the format of the dates is not the same
I would like to have either the format dd/mm/yyyy or the format mm/yy
Is there any way of doing that in matlab?
The full date vector is 40000 by 1 thanks
Best Answer